U-Cart Ready Mix Concrete
in Kansas City!
- Concrete Price plus $30.00 an hour rental on the U-cart. With a two hour minimum.
- Concrete U-Carts MUST be brought back cleaned out.
- If the cart comes back dirty there will be a $240 cleaning fee. The initial fee will cover the first hour of chipping.
- Each additional hour of chipping will be $120 an hour.
- We do NOT mix when it is raining or temperatures below 40 degrees.
- 1/2-ton truck or larger required for towing with a frame mounted 2″ ball.
Quantity
|
6-Sack Mix (4,000 PSI)
|
---|---|
1/4 Yard
|
$105
|
1/2 Yard
|
$130
|
3/4 Yard
|
$155
|
1 Yard
|
$190
|
Add-Ons:
|
|
Delay Packet (Delays Cure Time)
|
$6.50
|
Air Entrainment
|
Included w/ Concrete Purchase
|
James Snider
Google Review
Lance Loehr
Google Review
I reserved an excavator for Friday morning and I told them I would be there when they open. They greeted me when I walked in with a smile and I was out loading in a matter of minutes. I was in and out in less than twenty minutes. Other rental companies are closer to where I live but I will continue to use Bledsoe.
William Slusher
Google Review
So very friendly and professional. I rented a concrete block saw and it was brand new and in amazing working order. So much better than other rental experiences. It's not the closest to me, but they are worth the drive. Joyce is so friendly and the rest of crew area as well. Wide range of newer equipment. Definitely the best in town.
Picked up 2 loads of concrete today. They were very busy!!! They still had me checked out, hooked to a trailer and had it loaded with a yard of concrete in approximately 20 minutes. Hands down the best service I have had anywhere in a long time. Thank you!